Can be applied to single-storey prefabricated houses Fast, Economical, lightweight construction techniques have in industrialized. Our goal is to light building sector, our client is the fastest, economic, and modern to provide services. The production in our factory, a fast, high-quality and has been practiced all over the world due to the economic nature of the prefabricated prefabrication methods are used. Fiber cement board is made by applying the material and steel system with many factors in the selection of prefabricated structures intended use of the building, architecture, and way of life of human beings, taking into account local conditions and appropriate SINGLE STOREY prefabricated houses, prefabricated buildings, prefab homes are produced.
Showing posts with label construction. Show all posts
Showing posts with label construction. Show all posts
Saturday, May 11, 2013
Double Storey Prefabricated House
Double Storey Prefabricated houses are manufactured to meet the requirements of all kinds of weather. The material used in interior and exterior surfaces of prefabricated housing does not include harmful material non-flammable, water-swell resistant, mildew-proof, unaffected by moisture, insects proof, excellent sound and heat insulation. TWO STOREY prefabricated houses
Steel Structure House
* Steel building construction, the production of the factory by the millimetric precision computer controlled machines konstürksiyon wall panels and structural steel columns completed assembly is done by the workers at the construction site. In homes, the risk of corrosion does not occur through the use of galvanized steel
* Steel housing, including the prime mover, all elements of the rivets, screws and bolts were made by using a smart earthquake resistance increases and the impacts of any cracking occurring in the earthquake occurs.
* Steel construction begins operations are completed, the house dressing. OSB (Oriented Strant OSB-Board) on the coated steel frame, available in the market can easily be applied to all types of siding and roofing materials.
* External thermal insulation panels from the dress-up operations continued dübellenmektedir profile cavities.
Advantages of Our Products
1 - Setup a cool and practical;
Production is made in factories, assembly is completed in a short time. As soon as possible, will be delivered fast and quickly done. Repeatedly removed and can be installed to the desired location.
2 - environmentalist;
Polluting the environment, installation is completed without damage.
3 - Affordable, economical;
High construction costs are eliminated.
4 - Compatible and Flexible;
Upon request, special designs, modern aesthetics, new projects can be produced. Applicable to all kinds of residence and purpose. Thanks to its modular prefabricated structure can be expanded at any time as you want.
Technical Information
Products 80 Kg / m2 snow load, 90 km / h wind speed, and 3 1.Degree earthquake conditions Are being produced based on the climate zone.
1 - EXTERNAL AND INTERNAL WALL PANELS:
A-Walls 8X1250X2500 mm size, double-sided cement board. .
B-rigid polystyrene foam between two plates pressed load-carrying capability is provided.
C-40 mm thick polystyrene rigid foam used for thermal insulation.
D-heat conduction coefficient K: 0.64 kcal/m2 hc.
2 - WALL COMPOSITION:
GALVANIZED join sheet metal bending elements are combined with special clamping system.
Sweating occurs as a result will not rust radius edges.
3 - Doors:
A-Exterior doors steel joinery and measures 80 X 200 cm.
B-80x200 ölçülerindedir.İç Interior doors MDF doors, double-sided pressure-plated metal frame and wings.
C-external doors, interior doors, mortise lock cylinder will be installed.
Question and Answer
Q: Is Prefab housing structure reduces the net usage area?
ANSWER: No. It does not. Rather than a structure with a reinforced concrete structural system provides 10% of net area gain
QUESTION: What is the solution for cold regions?
ANSWER: 1 Alternative: thickening of the exterior walls, roof insulation, thickening 2 Alternative: additional coating exterior of the building (heat insulation, PVC siding, etc. ..) 3 Alternative: Roof covering replacement (OSB + Membrane + Shingle) to
Q: What is the delivery time?
ANSWER: Average 100m2 single storey building on our current production by the second day and completed within 15 days, are ready for despatch. The shipment and delivery of the concrete floor of the building in 5 days after the installation is complete.