Q: Is Prefab housing structure reduces the net usage area?
ANSWER: No. It does not. Rather than a structure with a reinforced concrete structural system provides 10% of net area gain
QUESTION: What is the solution for cold regions?
ANSWER: 1 Alternative: thickening of the exterior walls, roof insulation, thickening 2 Alternative: additional coating exterior of the building (heat insulation, PVC siding, etc. ..) 3 Alternative: Roof covering replacement (OSB + Membrane + Shingle) to
Q: What is the delivery time?
ANSWER: Average 100m2 single storey building on our current production by the second day and completed within 15 days, are ready for despatch. The shipment and delivery of the concrete floor of the building in 5 days after the installation is complete.
Q: How is your payment term?
ANSWER: As of the Convention, including KDV total amount, 50% is collected in cash. The remaining balance of 30 and 60 days as of the date the contract term will be charged as a check. Alternative payment plans can be discussed mutually.
Q: How many floors you can build up.
ANSWER: You can do two-storey. It can be multi-level, but it increases the cost of the unit m2 building construction will increase.
QUESTION: What is the approximate time of use of buildings?
ANSWER: The second year of a building's exterior and interior painting can be used easily for 50 years.
Q: What are the specifications of the materials you use?
ANSWER: You can see our website is part of the technical specifications.
Q: I want to implement the projects we can do that?
ANSWER: You can be as long as the project complies with our standard axle sizes.
Q: Is Prefab homes only for summer?
ANSWER: Prefabricated houses are equipped with 4 seasons insulation system that will allow you to use. Produced in accordance with the climate conditions of each building. Structures will be installed
carried out taking into account the climatic conditions of the place of production.
Q: Can I apply WC and bathroom ceramics?
ANSWER: reinforced concrete buildings, prefabricated buildings, all applications can also be made.
Q: Can I hang on the wall board?
ANSWER: Wall panel system with screws instead of nails, this application can be
Q: Can I do it myself during the renovation Prefabricated dye my quarters?
ANSWER: Reinforced concrete buildings, prefabricated buildings are very comfortable as you can paint yourself.
Q: Does a two-storey buildings sway mezzanine?
ANSWER: The calculations of these buildings with the relevant standards (TS 648, TS 498, TS 11372, etc.). Yapılmaktadır.Bu accordance with regulations and therefore the amount of deflection of the intermediate floors may be allowed for increased comfort conditions vardır.Fakat customer does not want it to be completely destroyed and sway. Account during the project possible.
Q: Is it possible to have received the building later removed to another location? What does it cost?
ANSWER: Yes to install. Only the cost of dismantling, re-assembly consists of the cost and the cost of paint. Buildings can be renovated if desired.
Q: Is there any harm to the environment and human prefabricated buildings?
ANSWER: Absolutely not. All materials used are manufactured in accordance with the terms of the TSE.
QUESTION: What is the status of earthquake-resistant prefabricated houses for?
ANSWER: Considering the conditions in 1.deprem produced prefabricated houses.
Q: Can I choose the paint color if you do not have a solid color?
ANSWER: You can choose a color that you want.
Q: transportation of prefabricated buildings are what means?
ANSWER: Prefabricated buildings, transport truck, truck, ship, train or cargo aircraft
maintained.
Q: Where and how to assemble the prefabricated building is on the ground?
ANSWER: Light prefabricated prefabricated structures are assembled on the concrete floor. Installation of the concrete floor anchors are made of prefabricated buildings or steel inserts. Thus, together with the building of concrete acts.